linkedin
Vendor Reg. Form

Completed Projects

Filter Projects:

1.

Financial Consultant for 4 Laning of Aligarh - Kanpur section from Km. 289 (Design Chainage 363.394) [Package - IV from Naviganjh - Mitrasen] of NH-91 in the State of Uttar Pradesh under NHDP Phase - IV.

Financial Consultant for 4 Laning of Aligarh - Kanpur section from Km. 289 (Design Chainage 363.394) [Package - IV from Naviganjh - Mitrasen] of NH-91 in the State of Uttar Pradesh under NHDP Phase - IV.

2.

Financial Consultant for 4 - laning of Varanasi Gorakhpur section of NH-29 from Kme. 148.000 (Design chainage 149.540) to Km. 208.300 (Design Chainage 215.160) [Package - IV Amilla Village to Gorakhpur] in the State of Uttar Pradesh under NHDP Phase -IV on EPC Mode.

Financial Consultant for 4 - laning of Varanasi Gorakhpur section of NH-29 from Kme. 148.000 (Design chainage 149.540) to Km. 208.300 (Design Chainage 215.160) [Package - IV Amilla Village to Gorakhpur] in the State of Uttar Pradesh under NHDP Phase -IV on EPC Mode.
3.

Financial Consultant for preparation of Final EPC document for signing of contract Agreement i.e. Stage - V work of Rehabilitation and upgradation of NH-4 from Km. 133.36 to Km. 171.59 (Andhra Pradesh /Tamil Nadu Border to Nalagampalli Village) to four lane with paved shoulder in the state of Andhra Pradesh under NHDP - IV on EPC Mode.

Financial Consultant for preparation of Final EPC document for signing of contract Agreement i.e. Stage - V work of Rehabilitation and upgradation of NH-4 from Km. 133.36 to Km. 171.59 (Andhra Pradesh /Tamil Nadu Border to Nalagampalli Village) to four lane with paved shoulder in the state of Andhra Pradesh under NHDP - IV on EPC Mode.
4.

Financial Consultancy for Construction of Four lane access controlled Greenfield National Highway from Balbhadarpur (Ch. 47+000) to Bela Nawada (Ch. 89+210), at Nh-119D under Bharatmala Pariyojna in the State of Bihar (Amas - Darbhanga Package - IV of 42.210 Km) on HAM mode.

Financial Consultancy for Construction of Four lane access controlled Greenfield National Highway from Balbhadarpur (Ch. 47+000) to Bela Nawada (Ch. 89+210), at Nh-119D under Bharatmala Pariyojna in the State of Bihar (Amas - Darbhanga Package - IV of 42.210 Km) on HAM mode.
5.

Construction of 4 - Lane Bangalore - Chennai Expressway from Km. 71.000 to Km. 96.000 (Baireddypalle) in the State of Andhra Pradesh section under Bharatmala on Hybrid Annuity Mode (Phase II/Package I) - Engagement of Financial Consultant.

Construction of 4 - Lane Bangalore - Chennai Expressway from Km. 71.000 to Km. 96.000 (Baireddypalle) in the State of Andhra Pradesh section under Bharatmala on Hybrid Annuity Mode (Phase II/Package I) - Engagement of Financial Consultant.
6.

Financial Consultant for balance work (Length 38 Km) of 2 Lane with paved shoulders of Bhopal - Sanchi Section from Km. 0.000 to Km. 53.775 of NH-86 Extn. In the State of Madhya Pradesh on Engineering Procurement and Construction (EPC) Mode.

Financial Consultant for balance work (Length 38 Km) of 2 Lane with paved shoulders of Bhopal - Sanchi Section from Km. 0.000 to Km. 53.775 of NH-86 Extn. In the State of Madhya Pradesh on Engineering Procurement and Construction (EPC) Mode.
7.

Consultant/Transaction Adviser for due - Deligence /conducting Technical & Financial Feasibility Study, Preparation / updating of Bid Documents (RFQ, RFP and CA) and Bid Process Management etc. for development of Passenger Ropeway between Bhuntar to Bijli Mahadev in Kullu District in Himachal Pradesh on PPP Mode.

Consultant/Transaction Adviser for due - Deligence /conducting Technical & Financial Feasibility Study, Preparation / updating of Bid Documents (RFQ, RFP and CA) and Bid Process Management etc. for development of Passenger Ropeway between Bhuntar to Bijli Mahadev in Kullu District in Himachal Pradesh on PPP Mode.
8.

Consultant for conducting Financial Feasibility Study, Structuring of Project Under Various options, Preparation of Bid Documents (RFQ, RFP and CA) and Bid Process Management etc. for development of Passenger Ropeways (Dharamshala to Mcleodganj/Triund, Naina Devi Ji to Toba and Deothsidh to Shahatalai) in Himachal Pradesh under Public Private Partnership (PPP) Mode.

Consultant for conducting Financial Feasibility Study, Structuring of Project Under Various options, Preparation of Bid Documents (RFQ, RFP and CA) and Bid Process Management etc. for development of Passenger Ropeways (Dharamshala to Mcleodganj/Triund, Naina Devi Ji to Toba and Deothsidh to Shahatalai) in Himachal Pradesh under Public Private Partnership (PPP) Mode.
9.

Financial Consultancy Services for "Development of Six - Lane acess - Controlled highway from Design Chainage 8+130 (Near Mohand) to 16+380 Daat Kali Tunnel of Ganeshpur - Dehradun section of NH-72A in the State of Uttar Pradesh & Uttarakhand under Bharatmala Pariyojana on EPC mode (Package - 2)"

Financial Consultancy Services for "Development of Six - Lane acess - Controlled highway from Design Chainage 8+130 (Near Mohand) to 16+380 Daat Kali Tunnel of Ganeshpur - Dehradun section of NH-72A in the State of Uttar Pradesh & Uttarakhand under Bharatmala Pariyojana on EPC mode (Package - 2)"
10.

Financial Consultant for Six Laning of Kadambattukonam (Km. 517.250) - Kazhakuttam Jn. (Km. 547.080) section of New NH-66 (Old NH-47) in the State of Kerala on EPC Mode under Bhatamala Pariyojana.

Financial Consultant for Six Laning of Kadambattukonam (Km. 517.250) - Kazhakuttam Jn. (Km. 547.080) section of New NH-66 (Old NH-47) in the State of Kerala on EPC Mode under Bhatamala Pariyojana.
11.

Financial Consultant for Rehabilitation and UP-gradation from 2 Lane to 4 lane of NH Stretch under NHDP IVB for Lalganj - Hanumanha Section of NH-7 (Pkg-3) on EPC Mode in the State of Uttar Pradesh & Design chainge Km. 96+800 to 140+200.

Financial Consultant for Rehabilitation and UP-gradation from 2 Lane to 4 lane of NH Stretch under NHDP IVB for Lalganj - Hanumanha Section of NH-7 (Pkg-3) on EPC Mode in the State of Uttar Pradesh & Design chainge Km. 96+800 to 140+200.
12.

Financial Consultant for Four Laning with Paved Shoulders from Km. 0.000 (Existing Km. 185.000 at NH-9) to KM. 32.450 (Existing Km. 29.400) (Design Length = 32.450 Km.) of NH-365A on Kodad - Khammam - Kurvi road in the State of Telangana on Hybrid Annuity Mode.

Financial Consultant for Four Laning with Paved Shoulders from Km. 0.000 (Existing Km. 185.000 at NH-9) to KM. 32.450 (Existing Km. 29.400) (Design Length = 32.450 Km.) of NH-365A on Kodad - Khammam - Kurvi road in the State of Telangana on Hybrid Annuity Mode.
13.

Financial Consultancy work for Rehabilitation and Upgradation of 4 lane configuration and strengthening of Tumkur - Shivamogga section from 119.790 (Design Ch. 121.900) Banwara Bypass to Km. 166+100 (Design Km. 170+415) Bettadahalli village (Start of Proposed Tarikere bypass) of NH-206 in the State of Karnataka under NHDP Phase -IV on Hybrid Annuity Mode. (Package - III).

Financial Consultancy work for Rehabilitation and Upgradation of 4 lane configuration and strengthening of Tumkur - Shivamogga section from 119.790 (Design Ch. 121.900) Banwara Bypass to Km. 166+100 (Design Km. 170+415) Bettadahalli village (Start of Proposed Tarikere bypass) of NH-206 in the State of Karnataka under NHDP Phase -IV on Hybrid Annuity Mode. (Package - III).
14.

Financial Consultant for Long term Remedial measures at Identified black spots to be executed on EPC mode on existing four lane Jetpur - Rajkot Section from Km. 117.000 to Km. 185.000 on NH-8B in the State of Gujarat.

Financial Consultant for Long term Remedial measures at Identified black spots to be executed on EPC mode on existing four lane Jetpur - Rajkot Section from Km. 117.000 to Km. 185.000 on NH-8B in the State of Gujarat.
15.

Financial Consultant for Six Laning of Start of Kollam Bypass (Km. 486.000) - Kadambattukonam (Km. 517.250) section of new NH-66 (Old NH-47) in the State of Kerala on Hybrid annuity Mode under Bharatmala Pariyojana.

Financial Consultant for Six Laning of Start of Kollam Bypass (Km. 486.000) - Kadambattukonam (Km. 517.250) section of new NH-66 (Old NH-47) in the State of Kerala on Hybrid annuity Mode under Bharatmala Pariyojana.
16.

Financial / Legal Consultancy Service for Project - Development of 6 lane of Kundli - Manesar - Palwal Express way in the State of Haryana on BOT Annuity basis.

Financial / Legal Consultancy Service for Project - Development of 6 lane of Kundli - Manesar - Palwal Express way in the State of Haryana on BOT Annuity basis.
17.

Financial Consultant for Four Laning of Haridwar - Nagina section of EUP mitigation measures on NH-74 in the state of Uttarakhand NHDP Phase-IV on EPC Mode (from Design Chainage LHS from 13+829 to 17+100 & 26+077 to 27+490 and Design Chainage RHS from 13+839 to 17+120 & 26+078 to 27+509.

Financial Consultant for Four Laning of Haridwar - Nagina section of EUP mitigation measures on NH-74 in the state of Uttarakhand NHDP Phase-IV on EPC Mode (from Design Chainage LHS from 13+829 to 17+100 & 26+077 to 27+490 and Design Chainage RHS from 13+839 to 17+120 & 26+078 to 27+509.
18.

Financial Consultant for Development of Emergency Laning Facility on National Highways - Construction of Emergency Landing Facility on Srinagar to Banihal section from Km. 187.000 to Km. 189.350 (Banihal Bypass) in the State of Jammu & Kashmiron EPC mode.

Financial Consultant for Development of Emergency Laning Facility on National Highways - Construction of Emergency Landing Facility on Srinagar to Banihal section from Km. 187.000 to Km. 189.350 (Banihal Bypass) in the State of Jammu & Kashmiron EPC mode.
19.

Financial Consultant-cum-Transaction Advisor for rendering consultancy services for the setting up of a New Rail Coach Factory at Palakkad, Kerala.

Financial Consultant-cum-Transaction Advisor for rendering consultancy services for the setting up of a New Rail Coach Factory at Palakkad, Kerala.
20.

Financial Consultancy Development of Six -Lane Access Controlled Highway from Ranipur Barsi (Saharanpur district) to Adhoya Musalmana (Ambala district) (from Ch. 45+500 to 84+400) of Shamli - Ambala section of Bareilly - Ludhiana Economic Corridor on EPC Mode under Bharatmala Pariyojana Phase-I in the State of Haryana (Package -2).

Financial Consultancy Development of Six -Lane Access Controlled Highway from Ranipur Barsi (Saharanpur district) to Adhoya Musalmana (Ambala district) (from Ch. 45+500 to 84+400) of Shamli - Ambala section of Bareilly - Ludhiana Economic Corridor on EPC Mode under Bharatmala Pariyojana Phase-I in the State of Haryana (Package -2).
21.

Financial Consultant for Construction of Four lane access controlled Greenfield National Highway from Shivrampur (Ch. 55+002 Km) to Ramnagar (Ch. 109+324 km), at NH-119D under Bharatmala Pariyojna in the state of Bihar- (Amas - Darbhanga Package-II of 54.322 Km)” (“Project”)

Financial Consultant for Construction of Four lane access controlled Greenfield National Highway from Shivrampur (Ch. 55+002 Km) to Ramnagar (Ch. 109+324 km), at NH-119D under Bharatmala Pariyojna in the state of Bihar- (Amas - Darbhanga Package-II of 54.322 Km)” (“Project”)
22.

Financial Consultant for Construction of Four Lane Access Controlled Greenfield National Highway from Balbhadarpur (Ch.47+000) to Bela Nawada (Ch. 89+210), at NH-119D under Bharatmala Pariyojna in the State of Bihar- (Amas - Darbhanga Package-4 of 42.210 km) on HAM Mode

Financial Consultant for Construction of Four Lane Access Controlled Greenfield National Highway from Balbhadarpur (Ch.47+000) to Bela Nawada (Ch. 89+210), at NH-119D under Bharatmala Pariyojna in the State of Bihar- (Amas - Darbhanga Package-4 of 42.210 km) on HAM Mode
23.

Financial Consultancy for Construction of 4 Lane Green Field Highway from TN/KA Border (Chainage 0+000) to Hoskote (Chainage 20+900) under Bharatmala Pariyojana as a part of Bangalore Ring Road in the State of Karnataka on EPC Mode.

Financial Consultancy for Construction of 4 Lane Green Field Highway from TN/KA Border (Chainage 0+000) to Hoskote (Chainage 20+900) under Bharatmala Pariyojana as a part of Bangalore Ring Road in the State of Karnataka on EPC Mode.
24.

Financial Consultant for Construction of 4-Laning of Thalasseri - Mahe Bypass from Km. 170.300 to Km. 188.000 of NH-17.

Financial Consultant for Construction of 4-Laning of Thalasseri - Mahe Bypass from Km. 170.300 to Km. 188.000 of NH-17.
25.

Financial Consultancy Services for Vadodara - Mumbai Expressway to be executed as BOT (Toll) Project on DOFO pattern under NHDP Phase -VI Phase 1 Part A: Vadodara to Km. (Km. 378.740 to Km. 254.430).

Financial Consultancy Services for Vadodara - Mumbai Expressway to be executed as BOT (Toll) Project on DOFO pattern under NHDP Phase -VI Phase 1 Part A: Vadodara to Km. (Km. 378.740 to Km. 254.430).
26.

Financial Consultant for Four Laning of Vikravandi - Pinalur - Sethiyahopu from Km. 0.000 to 65.940 Section of NH45C in the State of Tamilnadu under NHDP-IV on EPC Mode.

Financial Consultant for Four Laning of Vikravandi - Pinalur - Sethiyahopu from Km. 0.000 to 65.940 Section of NH45C in the State of Tamilnadu under NHDP-IV on EPC Mode.
27.

Financial Consultant for Constructionl, Operation and Maintenance of Zozila tunnel including approaches on NH No. 1 (Sringar - Sonmarg - Gumri road) in the State of J&K on Design, Build,Finance, Operate and Transfer (Annuity) Basis.

Financial Consultant for Constructionl, Operation and Maintenance of Zozila tunnel including approaches on NH No. 1 (Sringar - Sonmarg - Gumri road) in the State of J&K on Design, Build,Finance, Operate and Transfer (Annuity) Basis.
28.

Financial Consultancy for Construction of 6-Lane Greenfield Varanasi - Ranchi - Kolkata Highway from Donoreshan village to Junction with NH-20 in Bongabar village from Km. 288.600 to Km. 325.500 under Bharatmala Pariyojana in the state of Jharkhand on Hybrid Annuity Mode (Package 11)

Financial Consultancy for Construction of 6-Lane Greenfield Varanasi - Ranchi - Kolkata Highway from Donoreshan village to Junction with NH-20 in Bongabar village from Km. 288.600 to Km. 325.500 under Bharatmala Pariyojana in the state of Jharkhand on Hybrid Annuity Mode (Package 11)
29.

Financial Consultant for Rehabilitation and upgradation of NH-4 from Km. 133.36 to Km. 171.59 (Andhra Pradesh / Tamil Nadu Border to Nalagampalli village) to four lane with paved shoulder in the State of Andhra Pradesh under NHDP-IV on EPC Mode.

Financial Consultant for Rehabilitation and upgradation of NH-4 from Km. 133.36 to Km. 171.59 (Andhra Pradesh / Tamil Nadu Border to Nalagampalli village) to four lane with paved shoulder in the State of Andhra Pradesh under NHDP-IV on EPC Mode.
30.

Financial Consultancy service for substitution in Project Six Lane of Greenfield proposed Udaipur Bypass (Connection between NH-76 at existing Km. 118.500 at Debari to NH-8 Km. 287.400 at Kaya Village on Hybrid Annuity Mode -Package IV under NHDP Phase -V inthe State of Rajasthan.

Financial Consultancy service for substitution in Project Six Lane of Greenfield proposed Udaipur Bypass (Connection between NH-76 at existing Km. 118.500 at Debari to NH-8 Km. 287.400 at Kaya Village on Hybrid Annuity Mode -Package IV under NHDP Phase -V inthe State of Rajasthan.
31.

Financial Consultant for Balance work for construction of 4 laning of Barasat - Krishnagar Section of NH-34 from Km. 48.533 to Km. 115.272 (Length 66.72 Km.) on EPC mode in Nadia District in the State of West Bengal.

Financial Consultant for Balance work for construction of 4 laning of Barasat - Krishnagar Section of NH-34 from Km. 48.533 to Km. 115.272 (Length 66.72 Km.) on EPC mode in Nadia District in the State of West Bengal.
32.

Financial Consultant for Four Laning of Tumkur Shivamogga section from Km. 121+900 (Banawara) to Km. 170+415 (Bettadahalli) section of NH-206 in the State of Karnataka, on Hybrid Annuity Mode under Bharatmala Pariyogna (Package - III)

Financial Consultant for Four Laning of Tumkur Shivamogga section from Km. 121+900 (Banawara) to Km. 170+415 (Bettadahalli) section of NH-206 in the State of Karnataka, on Hybrid Annuity Mode under Bharatmala Pariyogna (Package - III)
33.

Financial Consultant for Four - Laning of Puducherry - Poondiyankuppam section of NH-45 A ( New NH 32) from Km. 29.000 to Km. 67.000 (Design Chainage) under Bharatmala Pariyojana Phase I (Residual NHDP IV works) on HAM in the State of Tamil Nadu and Union Territory of Puducherry.

Financial Consultant for Four - Laning of Puducherry - Poondiyankuppam section of NH-45 A ( New NH 32) from Km. 29.000 to Km. 67.000 (Design Chainage) under Bharatmala Pariyojana Phase I (Residual NHDP IV works) on HAM in the State of Tamil Nadu and Union Territory of Puducherry.
34.

Vetting / review the documents of financial close, submitted by the Concessionaire in accordance with Clause 4.1.3 of Concession Agreement / Policy Circular No. 8.2.9/2021 dated 03.06.2021 for the projects under InvIT Bundle-1

Vetting / review the documents of financial close, submitted by the Concessionaire in accordance with Clause 4.1.3 of Concession Agreement / Policy Circular No. 8.2.9/2021 dated 03.06.2021 for the projects under InvIT Bundle-1
35.

Financial Consultancy Servcies for "Evaluation of Bids/ applications for Empanelment / Pre-Qualification of Firms for Carrying out the Maintenance works of National Highways on Output and Performance based Maintenance Contract for the FY 2023 - 24"

Financial Consultancy Servcies for "Evaluation of Bids/ applications for Empanelment / Pre-Qualification of Firms for Carrying out the Maintenance works of National Highways on Output and Performance based Maintenance Contract for the FY 2023 - 24"
36.

Financial Consultant for the project "Six Lane Chittoor - Thatchur Road from Km. 0.000 (Varadharajula) to Km. 43.800 (Kumarajapet) on Hybrid Annuity Mode un Bharatmala Pariyojna in the State of Andhra Pradesh and Tamil Nadu (Package -I)

Financial Consultant for the project "Six Lane Chittoor - Thatchur Road from Km. 0.000 (Varadharajula) to Km. 43.800 (Kumarajapet) on Hybrid Annuity Mode un Bharatmala Pariyojna in the State of Andhra Pradesh and Tamil Nadu (Package -I)
37.

Financial/ Legal Consultancy Services for Project - Development of 6 lane of Manesar - Palwal Expressway in the State of Haryana on item rate basis.

Financial/ Legal Consultancy Services for Project - Development of 6 lane of Manesar - Palwal Expressway in the State of Haryana on item rate basis.
38.

Financial Consultant for Construction of 4-laning of Karimnagar Warangal Section of NH-563 from Design Ch.49.275 (Existing Ch. 170.400 of SH-1) at Manakondur bypass to Design Ch. 116.875 (Existing Ch.144.050 of NH-163) at Palvelpula near Hanamkonda (Design Length 67.600 km) in the State of Telangana on Hybrid Annuity Mode under Bharatmala Pariyojana

Financial Consultant for Construction of 4-laning of Karimnagar Warangal Section of NH-563 from Design Ch.49.275 (Existing Ch. 170.400 of SH-1) at Manakondur bypass to Design Ch. 116.875 (Existing Ch.144.050 of NH-163) at Palvelpula near Hanamkonda (Design Length 67.600 km) in the State of Telangana on Hybrid Annuity Mode under Bharatmala Pariyojana
39.

Financial Consultant for 4 Laning of Moradabad - Bareilly Section from Km. 148.00 to Km. 262.000 constrction of Flyovers at Km. 260+350 (MoRTH identified Black Spot ID UP-02)-008) on Bareilly Bypass of Project Highway

Financial Consultant for 4 Laning of Moradabad - Bareilly Section from Km. 148.00 to Km. 262.000 constrction of Flyovers at Km. 260+350 (MoRTH identified Black Spot ID UP-02)-008) on Bareilly Bypass of Project Highway
40.

Financial Consultancy services for Short Term Improvement & Repairing, Maintenance on Lambia - Raipur Section of NH-458 (Package -II) from Km. 163.800 (Existing Chainage Km. 168.269) to 218.563 (Existing Chainage Km. 222.535) (Length 54.763 Km.) in the state of Rajasthan.

Financial Consultancy services for Short Term Improvement & Repairing, Maintenance on Lambia - Raipur Section of NH-458 (Package -II) from Km. 163.800 (Existing Chainage Km. 168.269) to 218.563 (Existing Chainage Km. 222.535) (Length 54.763 Km.) in the state of Rajasthan.
41.

Financial Consultancy for Formulation of USOF Scheme(s) for its project for provisioning of mobile services by installing 4072 Towers as identified by MHA in Left Wing Extremists (LWE) Phase - II project.

Financial Consultancy for Formulation of USOF Scheme(s) for its project for provisioning of mobile services by installing 4072 Towers as identified by MHA in Left Wing Extremists (LWE) Phase - II project.

42.

Financial Consultant for Formulation of USOF Scheme(s) for provision of 4G Based Mobile Services in 502 uncovered villages in aspirational District in Four States of Uttar Pradesh, Bihar, Madhya Pradesh & Rajasthan.

Financial Consultant for Formulation of USOF Scheme(s) for provision of 4G Based Mobile Services in 502 uncovered villages in aspirational District in Four States of Uttar Pradesh, Bihar, Madhya Pradesh & Rajasthan.

43.

Financial Consultancy for Six Laning of Surat - Nashik - Ahemdnagar Greenfield Strech (Package - IV from Km. 105.000 to Km. 146.000) in the State of Maharashtra to be executed on Hybrid Annuity Mode under Bharatmala Pariyojana.

Financial Consultancy for Six Laning of Surat - Nashik - Ahemdnagar Greenfield Strech (Package - IV from Km. 105.000 to Km. 146.000) in the State of Maharashtra to be executed on Hybrid Annuity Mode under Bharatmala Pariyojana.

44.

Financial Consultancy for Constructon of 4 Laning of Patna - Arrah - Sasaram of NH-119A of Total length 120.1 Km. in the State of Bihar on HAM Mode.

Financial Consultancy for Constructon of 4 Laning of Patna - Arrah - Sasaram of NH-119A of Total length 120.1 Km. in the State of Bihar on HAM Mode.

45.

Four laning of existing Beas – Baba Bakala – Dera Baba Nanak Section (NH-503D) starting from Beas NH-3 (Km. 417+700) and terminating at Kartarpur Sahib Corridor (Km. 0+000 of NH-354B & Km. 153+800 of NH-354) at Dera Baba Nanak under Bharatmala Pariyojana – Package-I – from intersection with Jalandhar-Amritsar Highway (NH 3) near Beas till Start of Batala Bypass near Village Acchhal (Km 0+000 to Km 31+300) on EPC mode in the State of Punjab

Four laning of existing Beas – Baba Bakala – Dera Baba Nanak Section (NH-503D) starting from Beas NH-3 (Km. 417+700) and terminating at Kartarpur Sahib Corridor (Km. 0+000 of NH-354B & Km. 153+800 of NH-354) at Dera Baba Nanak under Bharatmala Pariyojana – Package-I – from intersection with Jalandhar-Amritsar Highway (NH 3) near Beas till Start of Batala Bypass near Village Acchhal (Km 0+000 to Km 31+300) on EPC mode in the State of Punjab
46.

4 laning of Gagalheri - Saharanpur - Yamunanagar (UP- Haryana Border) section of NH-73 from Km. 33.00 to Km 71.640 (Design Chainage 00.000 to Km.35.400) Package I in the State of Uttar Pradesh under NHDP -IV on Hybrid Annuity Mode".

4 laning of Gagalheri - Saharanpur - Yamunanagar (UP- Haryana Border) section of NH-73 from Km. 33.00 to Km 71.640 (Design Chainage 00.000 to Km.35.400) Package I in the State of Uttar Pradesh under NHDP -IV on Hybrid Annuity Mode".
47.

Financial consultant for 4 laning of Gagalheri - Saharanpur - Yamunanagar (UP- Haryana Border) section of NH-73 from Km. 33.00 to Km 71.640 (Design Chainage 35.400 to Km. 86.855) Package II in the State of Uttar Pradesh under NHDP -IV on Hybrid Annuity Mode".

Financial consultant for 4 laning of Gagalheri - Saharanpur - Yamunanagar (UP- Haryana Border) section of NH-73 from Km. 33.00 to Km 71.640 (Design Chainage 35.400 to Km. 86.855) Package II in the State of Uttar Pradesh under NHDP -IV on Hybrid Annuity Mode".
48.

Financial Consultant for "4/6 Laning of Hyderabad - Vijaywada section of Nh-09 from Km. 40.000 to Km. 221.500) in the State of Andhra Pradesh under NHDP Phase III A on Design, Build Finance, Operate and Transfer (DBFOT) Toll basis.

Financial Consultant for "4/6 Laning of Hyderabad - Vijaywada section of Nh-09 from Km. 40.000 to Km. 221.500) in the State of Andhra Pradesh under NHDP Phase III A on Design, Build Finance, Operate and Transfer (DBFOT) Toll basis.
49.

Financial Consultancy work for Balance Four Laning workof Package -4 from Km. 315.000 (Near Nandura) to Km. 360.000 (Near Chikhli) section of Amravati Chikhli NH-6 in the State of Maharashtra to be executed as Hybrid Annuity Project Under Bharatmala Pariyojna.

Financial Consultancy work for Balance Four Laning workof Package -4 from Km. 315.000 (Near Nandura) to Km. 360.000 (Near Chikhli) section of Amravati Chikhli NH-6 in the State of Maharashtra to be executed as Hybrid Annuity Project Under Bharatmala Pariyojna.
50.

Financial Consultant for Design, Engineering, Finance, Construction, Operation and Maintenance of Amritsar - Wagha Border Section from Km. 455.400 to Km. 490.460 of NH-1 in the State of Punjab under NHDP Phase IIIA on Build, Operate and Transfer (BOT) basis.

Financial Consultant for Design, Engineering, Finance, Construction, Operation and Maintenance of Amritsar - Wagha Border Section from Km. 455.400 to Km. 490.460 of NH-1 in the State of Punjab under NHDP Phase IIIA on Build, Operate and Transfer (BOT) basis.
51.

Consultant for Valuation Exercise for Four BOT Road Projects.

Consultant for Valuation Exercise for Four BOT Road Projects.
52.

Engagement of Financial Consultants for Construction of challakaluripet bypass of NH-5 (New NH-16) in the State of Andhra Pradesh.

Engagement of Financial Consultants for Construction of challakaluripet bypass of NH-5 (New NH-16) in the State of Andhra Pradesh.
53.

Financial Consultancy Services for "Six Laning of Proposed Chilakaluripet Bypass, Chennai - Vijayawada section of NH 16 (Old NH 05) from Km. 357+400 to Km 371+920 (Bypass Length - 16.384 Kms.) on Hybrid Annuity Mode in the State of Andhra Pradesh under Bharatmala Pariyojna."

Financial Consultancy Services for "Six Laning of Proposed Chilakaluripet Bypass, Chennai - Vijayawada section of NH 16 (Old NH 05) from Km. 357+400 to Km 371+920 (Bypass Length - 16.384 Kms.) on Hybrid Annuity Mode in the State of Andhra Pradesh under Bharatmala Pariyojna."
54.

Financial Consultancy for Construction of Six Lane Chittoor - Thatchur Road from Km. 0.000 (Varadharajula) to Km. 43.800 (Kumarajapet) on Hybrid Annuity Mode under Bharatmala Pariyojna, in the State of Andhra Pradesh and Tamil Nadu (Package -I).

Financial Consultancy for Construction of Six Lane Chittoor - Thatchur Road from Km. 0.000 (Varadharajula) to Km. 43.800 (Kumarajapet) on Hybrid Annuity Mode under Bharatmala Pariyojna, in the State of Andhra Pradesh and Tamil Nadu (Package -I).
55.

Financial Consultant for the project "Consultancy Services for Preparation of Feasibility for 6 - Laning of Chitradurga to Haveri including newly proposed Chitradurga Bypass (Km. 189.00 to Km. 340.00) of NH-48 (Old NH-4) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V".

Financial Consultant for the project "Consultancy Services for Preparation of Feasibility for 6 - Laning of Chitradurga to Haveri including newly proposed Chitradurga Bypass (Km. 189.00 to Km. 340.00) of NH-48 (Old NH-4) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V".
56.

Financial Consultant for a) Chitradurga - Shimoga Section of NH-13 from Km. 422.00 to 520.300 under NHDP - IVA in the State of Karnataka on DBFOT basis (PPP) (b) Kerala Border to Kollegal Section of NH-212 from Km. 117.60 to 268.400 under NHDP -VIA in the State of Karnataka on DBFOT Basis. (PPP)

Financial Consultant for a) Chitradurga - Shimoga Section of NH-13 from Km. 422.00 to 520.300 under NHDP - IVA in the State of Karnataka on DBFOT basis (PPP) (b) Kerala Border to Kollegal Section of NH-212 from Km. 117.60 to 268.400 under NHDP -VIA in the State of Karnataka on DBFOT Basis. (PPP)
57.

Financial Consultant for Construction of 6-Lane access Controlled Greenfield highway from Km.125+000 to 150+000 of Deogarh (Near Dhandhaniya) - Rajasthan /Gujarat Border section of NH-754K as a part of Amritsara - Jamnagar Economic Corridor in the State of Rajasthan on EPC Mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-6)

Financial Consultant for Construction of 6-Lane access Controlled Greenfield highway from Km.125+000 to 150+000 of Deogarh (Near Dhandhaniya) - Rajasthan /Gujarat Border section of NH-754K as a part of Amritsara - Jamnagar Economic Corridor in the State of Rajasthan on EPC Mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-6)
58.

Financial Consultant for EPC Project - Improvement /Augmentation of Four Laning from Km. 5.000 to Km. 79.340 (Existing Chainage) [Design Chainage Km. 5.000 to Km. 79.900] and Two Laning with Paved Shoulder from Km. 79.340 to Km. 118.795 (Existing Chainage) [Design Chainage Km. 79.900 to Km. 120.110] of Madurai Ramanathapuram Section of NH-49 Todal Design Length = 115.110Km] in the State of Tamil Nadu on EPC Mode under NHDP Phase-III.

Financial Consultant for EPC Project - Improvement /Augmentation of Four Laning from Km. 5.000 to Km. 79.340 (Existing Chainage) [Design Chainage Km. 5.000 to Km. 79.900] and Two Laning with Paved Shoulder from Km. 79.340 to Km. 118.795 (Existing Chainage) [Design Chainage Km. 79.900 to Km. 120.110] of Madurai Ramanathapuram Section of NH-49 Todal Design Length = 115.110Km] in the State of Tamil Nadu on EPC Mode under NHDP Phase-III.
59.

Financial Consultant for Widening and Strengthening for improvement and Up-gradation of NH-709 A Garhmukteshwar (Chainage - 83+200 of NH-24) to Meerut (Chainage 9+860 ot NH-235) including connector to NH-119 Package XII in the State of Uttar Pradesh.

Financial Consultant for Widening and Strengthening for improvement and Up-gradation of NH-709 A Garhmukteshwar (Chainage - 83+200 of NH-24) to Meerut (Chainage 9+860 ot NH-235) including connector to NH-119 Package XII in the State of Uttar Pradesh.
60.

Financial Consultancy Services for Project - Development of Six-Lane Eastern Peripheral Expressway (NH No. NE-II) in the State of Haryana and Uttar Pradesh on EPC Mode - Package II - from 22 to Km. 46.50.

Financial Consultancy Services for Project - Development of Six-Lane Eastern Peripheral Expressway (NH No. NE-II) in the State of Haryana and Uttar Pradesh on EPC Mode - Package II - from 22 to Km. 46.50.
61.

Financial Consultancy for Project - Development of Six-Lane Eastern Peripheral Expressway (NH No. NE-II) in the State of Haryana and Uttar Pradesh on EPC mode - Package I - /from 1 to Km. 22.

Financial Consultancy for Project - Development of Six-Lane Eastern Peripheral Expressway (NH No. NE-II) in the State of Haryana and Uttar Pradesh on EPC mode - Package I - /from 1 to Km. 22.
62.

Financial Consultancy work for Development ofGurdaspur - Balsua section of NH-54 to six-lane Expressway standards as part of Delhi-Amritsar-Katra Expressway (Design Km. 397+700 to 423+500 of Delhi - Amritsar-Katra Expressway) including development of four-lane NH standards greenfield spur connectivity from Govindsar village on Delhi - Amritsar-Katra Expressway to Talwara on NH-44 in the State of Punjab on Hybrid Annuity Mode [Phase-II Package XIII].

Financial Consultancy work for Development ofGurdaspur - Balsua section of NH-54 to six-lane Expressway standards as part of Delhi-Amritsar-Katra Expressway (Design Km. 397+700 to 423+500 of Delhi - Amritsar-Katra Expressway) including development of four-lane NH standards greenfield spur connectivity from Govindsar village on Delhi - Amritsar-Katra Expressway to Talwara on NH-44 in the State of Punjab on Hybrid Annuity Mode [Phase-II Package XIII].
63.

Transaction Advisor Consultancy Services for the Construction/development of two lane cement concrete road from Gwalior Jhansi road to Ghonga (Billoua 8.00 Km) under Public Private Partnership (PPP) project.

Transaction Advisor Consultancy Services for the Construction/development of two lane cement concrete road from Gwalior Jhansi road to Ghonga (Billoua 8.00 Km) under Public Private Partnership (PPP) project.
64.

Financial Consultancy work for Widening of existing two lane of NH-648 (Old NH-207) to 4/6 lanes from Dobaspet (Km. 138+320) to end of Dodaballapur Bypass (Km. 97.350) Length of 40.970 Km & (Design Length 42.000 Km) on Hybrid Annuity Mode in the State of Karnataka under Bharatmala Pariyojna (Package -I).

Financial Consultancy work for Widening of existing two lane of NH-648 (Old NH-207) to 4/6 lanes from Dobaspet (Km. 138+320) to end of Dodaballapur Bypass (Km. 97.350) Length of 40.970 Km & (Design Length 42.000 Km) on Hybrid Annuity Mode in the State of Karnataka under Bharatmala Pariyojna (Package -I).
65.

Financial Consultants for 4 Laning of Jabalpur - Lakhnadon section of NH-7 from Km. 465.500 to Km. 546.425 in the State of Madhya Pradesh under Phase IV on Engineering, Procurement and Construction (EPC) Mode.

Financial Consultants for 4 Laning of Jabalpur - Lakhnadon section of NH-7 from Km. 465.500 to Km. 546.425 in the State of Madhya Pradesh under Phase IV on Engineering, Procurement and Construction (EPC) Mode.
66.

Financial Consultant for the project Two-lane with paved shoulder of Bhilwara-Ladpura section of NH-758 from Km. 87.250 to Km. 155.000 (Length 67.750 Km) in the State of Rajasthan under NHDP Phase-IV on EPC mode project.

Financial Consultant for the project Two-lane with paved shoulder of Bhilwara-Ladpura section of NH-758 from Km. 87.250 to Km. 155.000 (Length 67.750 Km) in the State of Rajasthan under NHDP Phase-IV on EPC mode project.
67.

Financial Consultant for Balance work of 4 - Laning of Muzaffarnagar - Haridwar Section on Nh-58 - Construction / Extension of Dudhadhari Elevated Flyover including approaches from Km. 206.220 to Km. 208.870 of NH-58 under EPC Mode Basis.

Financial Consultant for Balance work of 4 - Laning of Muzaffarnagar - Haridwar Section on Nh-58 - Construction / Extension of Dudhadhari Elevated Flyover including approaches from Km. 206.220 to Km. 208.870 of NH-58 under EPC Mode Basis.
68.

Financial Consultant for Four Laning of Oddanchatram - Madathukulam section of NH-209 (Design ch. Km. 29.000 to Km. 74.380) under Bharatmala Pariyojna Phase -I under the category of Residual works of NHDP on HAM in the State of Tamil Nadu.

Financial Consultant for Four Laning of Oddanchatram - Madathukulam section of NH-209 (Design ch. Km. 29.000 to Km. 74.380) under Bharatmala Pariyojna Phase -I under the category of Residual works of NHDP on HAM in the State of Tamil Nadu.
69.

Financial Consultant for Four Laning with paved shoulder of Porbandar - Dwarka section of NH-8E from Km. 356.766 (design chainage Km. 379.100) to Km. 469.963 (design chainage Km. 493.870) in the State of Gujarat (Package-8).

Financial Consultant for Four Laning with paved shoulder of Porbandar - Dwarka section of NH-8E from Km. 356.766 (design chainage Km. 379.100) to Km. 469.963 (design chainage Km. 493.870) in the State of Gujarat (Package-8).
70.

Request for Proposal (RFP) for selection of Financial Consultang for the Project named Four Laning of Rai Malkpur, (Rajasthan Border)- Namaut - Mahendergarh - Dadri - Bhiwani - Kharak on DBFOR basis.

Request for Proposal (RFP) for selection of Financial Consultang for the Project named Four Laning of Rai Malkpur, (Rajasthan Border)- Namaut - Mahendergarh - Dadri - Bhiwani - Kharak on DBFOR basis.
71.

Financial Consultant for the Project °Design, Engineering, Finance, Construction, Operation and Maintenance of Amritsar-Wagah Border Section from km 455.400 to km 491.620 of NH-1 in the state of Punjab under NHDP Phase IIIA on Build Operate and Transfer (BOT) basis

Financial Consultant for the Project °Design, Engineering, Finance, Construction, Operation and Maintenance of Amritsar-Wagah Border Section from km 455.400 to km 491.620 of NH-1 in the state of Punjab under NHDP Phase IIIA on Build Operate and Transfer (BOT) basis
72.

Financial Consultant for Four Laning of Varanasi Gorakhpur section of NH-29 from Km. 148.000 (Design Chainage 149.540) to Km. 208.300 (Design chainage 215.160) Package - IV Amilla Village to Gorakhpur) in the State of Uttar Pradesh under NHDP lPhase -IV on EPC mode.

Financial Consultant for Four Laning of Varanasi Gorakhpur section of NH-29 from Km. 148.000 (Design Chainage 149.540) to Km. 208.300 (Design chainage 215.160) Package - IV Amilla Village to Gorakhpur) in the State of Uttar Pradesh under NHDP lPhase -IV on EPC mode.

Copyright - All Rights Reserved © www.almondzglobalinfra.com | Powered by ITPL