Filter Projects:
Package-I: Development of 6-Laning Delhi-Meerut Expressway & 8-laning of NH-24 from Nizamuddin to existing Uttar Pradesh Border in Delhi on Hybrid Annuity Mode.
Package-III: Six laning from Existing Km. 27.740 to existing 49.346 (Dasna to Hapur) of NH-24 in Uttar Pradesh on Hybrid Annuity Mode.
Consultancy services for Authority`s Engineer for Supervision of `Two lane with hard shoulders of Pfutsero - Phek Road in Nagaland under SARDP-NE on EPC mode.
Technical Audit Consultancy Services for Rehabilitation and Upgrading to 2- lanes/2-lane with paved shoulders/4 lane configuration from single/intermediate lane and strengthening of stretches of various National Highways in the states of Rajasthan, Himachal Pradesh, Uttar Pradesh and Andhra Pradesh and consultancies under Green National Highways Corridor Projects (GNHCP) and balance activities related to National Highway Interconnectivity Improvement Project (NHIIP) funded by World Bank
Safety Consultant for Construction of New 4-lane Bridge Across River Kosi at Phulaut including Rehabilitation and Up gradation of existing Birpur – Bihpur Section of NH-106 from Km 106.000 to km 136.000 to 2-lane with paved shoulder in the state of Bihar (2/4-lane; 30Km)
Appointment of Safety Consultants for 2 projects (NH-128 Ambedkar Nagar - Raebareli & NH-232 Raebareli-Banda) Length-298.875 km in PIU- Raebareli
Construction of New 4 -lane Bridge Across River Kosi at Phulaut including Rehabilitation and Upgradation of existing Birpur - Bihpur section of NH-106 from Km. 106.000 to Km. 136.000 to 2 -Lane with Paved shoulder in the State of Bihar.
Appointment of Safety Consultant for Dewas to KhaIghat-MP/MH Border Stretch of New NH 52 HOLD NH-3) in Madhya Pradesh
Dwarka Expressway Project — Package- I from Shiv Murti Intersection at Km 20 of NH 8 to Road Under Bridge (RUB) near Dwarka sector 21 (from Km 0.800 to 5+300) Delhi - Work Order for Safety Consultancy Services
Dwarka Expressway Project - Package II from Road Under Ridge (RUB) near Sector-21 Dwarka to Delhi Haryana Boarder (Km 5.300 To Km 9.500) at Delhi - Work Order for Safety Consultancy Services
Safety Consultancy Services for Package 9 (Length=58.1 Km) including following projects in the State of Maharashtra (1) Construction of New 6-lane tunnel at Khamataki Ghat of NH-4 on EPC Mode (L=6.5 Km) (2) Integrated Infrastructure and Raod Development on NH-4 at Chandani Chowk (L=2.2 Km) (3) Dharampuri - Lonand, Pkg-IV (Sant Dyaneshwar Palkhi Marg) (L=49.4 Km.)
Safety Consultancy Services for Package 10 (Length=247.2 Km) including following projects in the State of Maharashtra (1) Sant Dnyaneshwar Palkhi Marg (Section of NH-965): a) Mohol to Wakhari, Pkg-1 (L=44.7 Km), b) Wakhri to Khudus, Pkg-II (L=33.1 Km), c) Khudus to Dharmapuri, Pkg-III (L=39.2 Km) (2) Sant Tukaram Palakhi Marg: a) Patas - Vasunde to Baramati (Part of Sant Tukaram Palakhi Marg including Indapur Bypass) Pkg I (L=41.4 Km), b) Baramati - Indapur Package - II (L=42.1 Km), c) Indappur - Akluj - tondale - Bondale Package - III (L=46.7 Km)
Design Safety Consultancy Services for “Formation of new six lane road from Punnapakkam (Design Chainage: Ch 35+000) to Thiruvallur Bypass (Design Chainage: Ch 47+800) with paved shoulders and two-lane service road on both sides in section 2 of Chennai Peripheral Ring Road under EPC mode
Safety Consultants Services for “Four laning of Haridwar-Nagina section of EUP mitigation measures on NH-74 in the state of Uttarkhand NHDP Phase-IV on EPC mode".
Road Safety Audit for Construction of 8 lane Expressway starting at Ch. 47.000 near Khanpur Ghati and ends at Haryana-Rajasthan border(Km 47.000 to Km 78.800) section of Delhi-Vadodara Greenfiled Alignment (NH-148N)under Bharatmala Pariyojana in the state of Haryana
Engagement of Safety Consultant Services during Operation and Maintenance of (i) Six laning & Strengthening of NH-248A From Existing Km 2+740 (Rajiv Chowk) to Km 11+682 in Gurugram on HAM in the state of Haryana (Package-I) (ii) Six laning & Strengthening of NH-248A from existing km. 11.682 to km. 24.536 (Design Ch. Km. 9.282 to km. 22.136) in the state of Haryana on HAM (Package-II) (iii) Delhi-Gurgaon section of NH-48 and other works along the project highway from km 11.060 to km 42.00 (Dhaula Kuan in Delhi to Kherki Dhaula Fee Plaza in Haryana)
Safety Consultant for Four Laning of NH-363 from Mancherial (Design Km. 0.000 / Existing Km.. 251.900) to Repallewada (Design Km. 42.000/ Existing Km. 288/510) (Desing Length - 42.000 Km) in the State of Telangana on HAM Mode.
Safety Consultant for Delhi - Amritsar - Katra Expressway (Phase -I Pkg-V) from Km. 120+250 to K. 157+920 (Total Length - 37.67 Km.) in the State of Haryana
Safety Consultant for 4 Laning of Dhillon Nagar (Moga) to Bajakhana (Lambawali) section of NH-105B, (Greenfield Alignment) from design Chainage Km. 0.000 to Km. 43.319 under Bharatmala Pariyjana in the State of Punjab on Hybrid Annuity Mode
Consultancy services for Authority`s Engineer for suppervision of 6/8 laning of Port road connectivity Project JNPT Phase - II (Package-3) - Construction of NH-348 (Old SH-54) from Km. 7.422 to Km. 13.160 and Amra Marg from Km. 0.000 to Km. 5.360 the state of Maharashtra on EPC mode.
Project Management Consultancy Services for upgradation to 2/4 lane with PS configuration of newly declared NH-516 B from its junction with NH -16 near Pendurthi connecting Kothavalasa, S. Kota and terminating at its junction with NH-516 E near Bowdara section the state of Andhra Pradesh for length of 40.20 Kms.
Consutancy services for Independent Engineer services for Package - II - Four Laning Byrapura to Challakere section of NH-150 A from Km. 308.550 to Km. 358.500 on HAM Mode under Bharatmala Pariyojana in the State of Karnataka.
Consultancy Services for Authrity`s Engineer for Supervision of "Six Laning of Tuticorin Port Road section of NH-7A (New NH-138) from Km. 0.000 to Km. 6.140 (Effective Length 5.16 Km) on EPC Mode in the state of Tamil Nadu on EPC Mode.
Consultancy Services for Authority`s Engineer for Supervision of "Construction of four lane with paved shoulder Agartala Bypass (Western side, length 25.402 km) connecting NH-8 (near Amtali) to Nh-108B (near Lembuchhera) in the state of Tipura on EPC basis
Independent Engineer Services for Construction of "Four Laning of NH 530 B from Devinagar Bypass (End) (Existing Km. 208.000 of NH 530 B / Design Km. 66.000) to Kasganj Bypass (End) Existing Km. 150.100 of NH 530 B / Design Km. 123.100) in the State of Uttar Pradesh on HAM mode.
Consultancy Services for preparation of Detailed Project Report for "Feasibility study and preparation of DPR for Construction of (1) Construction of 6 Lanes elevated corridor and development of road from ITI Tiraha to Anna Nagar upto Kasturba Nagar (Chetak Bridge) in Bhopal city (Length - 3 Km. approx.) Missing link of NH 46 (Old NH-12) Length cost Rs. 375 Cr. 2. Construction of 6 lanes elevated corridor and development of existing 4 lane road from Prabhat Chourah to Ratnagiri Tiraha from Km. 3+900 to Km. 8+900 in Bhopal city (length - 5.00 Km. approx.) NH-146 (Old NH-86) with service roads cost Rs. 700 Cr. 3. Construction of 6 lanes elevated corridor and development of road from Gautam Nagar to ISBT Kamla Pati railway station upto Veersawarker setu in Bhopal city (Length - 3.5 Km. approx.) missing link of NH-46 (Old NH-12) cost Rs. 437.5 Cr. 4. Construction of 6 lanes elevated corridor and development of existing 4 lane road including service road from start of CRRIAMPRI to the end of BRTS corridor (Misrod) section of NH-46 (old NH-12) (length 6.7 Km.) cost Rs. 900 Cr. Total Length 18.20 Kms. and Total Cost Rs. 2413 Cr. inthe State of Madhya Pradesh.
Independent Engineer Services for Four Laning of Nh-39 (old NH-75) from design Km. 97+600 (Existing Km. 96+470) (Udaipur village) to design Km. 147+540 (existing Km. 148.020) (Bhogu Village) in the State of Jharkhand on Hybrid Annuity Mode, (Package-II)
Construction of Two-laning with paved shoulders road under package AM 82-B, in the state of Maharashtra under MRIP on hybrid Annuity Mode (Nandura-Motala Road) Length 33.121 KM, SH-272
Package AM 84 - Construction of Two-lanning with paved shoulders road under, in the state of Maharashtra under MRIP on hybrid Annuity Mode (Chengefal-Matargaon-Khamgaon Road) Length 45.838 KM, SH-222
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of National Highway No. 217 (Paikan 0 Tura Section) in the State of Assam and Meghalaya.
Preparation of Feasibility study (FS), detailed project report (DPR) on EPC mode for upgradation of Main Road Budhal - Mahore - Gul to NHDL specification from Km. 0.00 to Km. 114.875 and Artery from Mahore at Km. 57.00 to Km. 68.00 on roads Reasi - Arnas - Mahore (Net length 125.875 Km) in 31 BRTF area under project Sampark in J&K State.
Consultancy Services for Preparation of Feasibility Study (FS) and Detailed Project Report (DPR) for Construction of RE-Alignment of various stretches between Pandrass - Pashkyum (Net Length - 31.00 Kms) on Road Zozila - Kargil - Leh (NH-1) to NHDL Specifications through EPC mode under projet Vijayak in Jammu and Kashmir State.
Preparation of Feasibility Study and Detailed Project Report for construction to 2 Lane with paved shoulder through Green Field from Vishwanathpur to Kharka Basant ( New NH-122 A) with Land Acquisition of Sitamarhi district in Bihar. (Job No. Nh122A-2022-23-BR-59).
Consultancy Servies for DPR preparation of Giridih Bypass on NH-114A including Land Acquisition and Utility Shifting.
Preparation of Feasibility Study/ Detailed Project Report of selected state road stretches for NH connectivity to Backward Areas/Religious/Tourist Places (BR) Scheme - Hospet (NH-67) - Hampi - Kamlapu - Gangavathi (Package - NHAI/T/7)
Engaging Technical Consultant for Prepration of Feasibility Study (FS) and Detailed Project Report (DPR) on EPC mode for widening / improvement of existing road Chakpikrong - Sajik - Tampak - Aigong - Khongtal to NHSL specifictaion (42 Km), construction of road Khemdo - Phaisanjang (Green Field alignment) to NHSL specification (25.9 Km) & Chakpikrong - Joupi (Green Field Alignment) to NHSL specifications (28 Km) under project SEWAK in Manipur State (Total Length 95.90 Km).
Preparation of Detailed Project Report for New Alignment for 2 lanes/2lane with paved shoulders configuration of stretch from Km. 95.200 near S.S.B. Camp (Ausani Village) to near UP Boarder on NH-727 – in the boundary zone of Valmiki Wildlife Sanctuary & Tiger Reserve & Tiger Reserve along Gandak River bank in Bihar State.
Consultancy Services for preparation of Detailed Project Report (DPR) for decongestion / bypass of NH-515 in Pasighat town (approx. 10Km) under Road Safety in the State of Arunachal Pradesh
Consultancy Services for Preparation of Detailed Project Report for Tunnel Car Parking at (i) Nainital- Bhavali Road Cantonment Board Land, Nainital (ii) Nainital - Haldwani Road near Rajkiya Vaidhshala, first Bend, Nainital in the State of Uttarakhand
Package -3/ Corridors Consultancy Services for Feasibility Study and Detailed Project Report for improvement and up-gradation oto 2-Lane with paved shoulder/ 4 - lane configuration of proposed Corridor from (i) Jharkhand Central Corridor : - Ranchi - Kathitanr - Thakurgaon -Burhmu - Tandwa - Chatra - Hunterganj Bihar Border Highway Corridor (ii) Tourist Corridor :- Milan Chowk - Sarjamdih -Tamar - Khunti - - Govindpur - Sisai - Ghaghra - Netarhat - Garu - Saryu - Latehar - Herhanj - Balumath - Mcluskiganj - Chama More Highway Corridor.
Consultancy Services for Preparation and finalization of Detailed Project Report for the project NSK-II (28) under Hybrid Annuity Model Program Phase -II - (i). 28 A - Bambhori Nimkhedi Jalgaon Asoda Raod MDR-59 (ii) 28 B - Jalgaon Mamurabad Vidgaon Kingaon Indore raod (iii) 28 C - Pachora Wadi Satgaon raod Sh - 40 Km. 94/600 to 115/350 Ta. Pachora (iv) 28 D - Amlad Mod Borad Tanradi Shahada Sangvi Hated Amalner road
Consultancy Services for Preparation and finalization of Detailed Project Report for the project NSK-II (20) under Hybrid Annuity Model Program Phase -II. (i) NSK-II (20A) - Reola - Nandagaon Pilakhod SH- 25, (ii) NSK -II (20 B) - Vani Dhodambe Vadalibhoi Bhoyegaon Dighghvad Salsane Talegaon Rohi Road
Consultancy Services for Preparation and finalization of Detailed Project Report for the project NSK-II (21) under Hybrid Annuity Model Program Phase - II. (i) NSK-II (21 A) - Ahava - Tarahabad - Nampur - Lakhmanpur - Manamad road, (ii) NSK-II (21 B) - Nandurbar Chhadavel, Nampur - Malegaon Manmad Yevola Kopargaon Rohuri Nagar Kamla Temburni Pandharpur Malgalvedha river Bombalad to state border SMS - 8, (iii) NSK-III (21 C) Strengthening and Widening of Satana Ajmer Saundane Ravalgaon Ajang Zodge Raod, (iv) NSK-II (21D) - Borgaon Palsadar Tirhale Pale Br. Manur Kalwan to (SH-27) Road MDR-8
Consultancy Services for Preparation and finalization of Detailed Project Report for the project KN-II (5) under Hybrid Annuity Model Program Phase - II. (i) KN-II (5A) - Improvement of A) Matheran reral Kalamb road SH-109 Km. 0/00 to 20/400, B) Labhyachiwadi sugve pimpaloli neral road MDR 104 Km. 3/00 to 14/00. (ii) KN-II (5B) - Cpmstruction of Concrete Pavement Raod & Reconstruction & widening of Bridges & culverts for i) Karlekhind Shiravali MDR-35 Km. 0/00 to 7/700, ii) Mandvaphata to Mandav Jetty SH-87 Km. 0/00 to 2/700 , iii) Karlekhind to Thal Vaishet Raod SH-89 Km. 0/00 to 7/00, iv) Shiravali Saral to Mandvaphata to Alibag Bypass road (Pen Raod Junction) MSH-4 Km. 235/830 to 262/500. (II) KN-II (5C) - Construction of Concrete Pavement Raod & Reconstruction & widening of Bridges & Culverts for i) Alibag Bypass raod (Pen Raod Junction) to Albag Roha Junction to Belkade to Garudpada Nagaon Hatale to Redanda Bridge Raod MSH-4 Km. 262/500 to 280/745, ii) Revdanda Bridge to Salav to Talekhar Road SH-92 Km. 0/00 to 13/00 total length 31.245 Km. & Construction of New Revdnada Major Creek Bridge.
Consultancy Services for Preparation of Detailed Project Report for Construction of `Tungri - Mathow - Dubbin - Dishing - Debrik` road approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total Length 84.00 Km. ) (Package-I)
Selection of Feasibility Consultant for Preparation of Detailed Feasibility Report for up-gradation of Pukhrayan - Ghatampur - Bindaki Road (SH-46) including Sikandra to Bhoginipur (SH-112), Length 109.54 Km. in Uttar Pradesh.
Consultancy Services for Authority`s Engineer for Supervision of two lane with hard shoulders of Chakabama - Sunheboto Road from (1) Design Km. 50.000 to Km. 75.000 (Existing Km. 52.370 to Km. 79.040) (ii) Design Km. 75.000 to Km. 95.000 (Existing Km. 79.040 to Km. 100.345) (iii) Design Km. 95.000 to Km. 115.534 ( Existing Km. 100.345 to Km. 122.250)" in the State of Nagaland under SARDP - NE on EPC Mode.
Consultancy Services for Authority`s Engineer for Supervision of "Two Lane with hard shoulders of Merangkong - Tamlu - Mon Road from : (i) Design Km. 0.000 to Km. 20.000 (existing Km. 0.000 to Km. 20.456) (ii) Design Km. 20.00 to Km. 40.000 (Existing Km. 20. 456 to Km. 41.065) (iii) Desing Km. 40.000 to Km. 59.000 (Existing Km. 41.065 to Km. 60.345) (iv) DEsing Km. 59.000 to Km. 86.835 (Existing Km. 60.345 to Km. 98.065)" in the State of Nagaland under SARDP - NE on EPC Mode.
Consultancy Services for Authority`s Engineer for Supervision of "Two Lane with Hard shoulders of Pfutsero - Phek Road from (i) Design Km. 0.000 to Km. 20.000 (existing Km. 0.000 to Km. 19.900) (ii) Desing Km. 20.000 to Km. 40.000 (Existing Km. 19.900 to Km. 40.090) (iii) Design km. 40.000 to Km. 62.558 (Existing Km. 40.090 to Km. 65.300)" in the state of Nagaland under SARDP -NE on EPC Mode.
Independent Engineer Services for Rehabilitation and Upgradation to Four Lane configuration & Strengthening of Sihuni to Rajol from Km. 51.000 to Km. 72.000 of NH-20 (New NH-154) (Design Length 18.450 Km) of Pathankot - Mandi Section under NH(O) in HP on HAM basis (Package -II A) (UPC: N/08033/02002/HP) Roads & Highway On going
Consultancy Services for Authority`s Engineer for Construction of 6-lane Durg - Raipur - Arang bypass section of NH-53 from Design Ch. 0+000 (Vill. Tendesara) to Design Ch. 44+500 (Vill. Parsada) in the state of Chhattisgarh on EPC Mode under Bharatmala (Package -I)
Consultancy Services of Authority`s Engineer for Supervision of Construction of Emergency Laning facility on National Highwasy - Development of emergency landing facility on Balasore - Kharagpur section from Km. 83.400 to Km. 88.400 (Total 5 Km) of NH-60) New Nh-16) inthe State of West Bengal on EPC Mode.
Consultancy Services for Authority`s Engineer for Supervision Rehabilitation and Upgradation of Jamkhed to Sautada section of NH-548D (From Km. 195. to Km. 208.774, Length - 13.399 Km) to 2 L + PS/4L configuration with rigid pavement in the State of Maharashtra on EPC mode.
Authority`s Engineer for Supervision of Rehabilitation & Upgradation of Kopargaon to Savali Vihir section (from Km. 354.00 to Km. 362.663 total length - 8.663 L of NH-752g to 4L+PS in the State of Maharashtra on EPC mode.
Consultancy Serices for Authority`s Engineer for Construction of 6-Lane Durg - Raipur - Arang Bypass section of NH-53 from Design Ch. 44+500 (Vill. Parsaa) to Design Ch. 92_230 (Vill. Paragaon) in the state of Chhattisgarh on EPC Mode under Bharatmala (Package - II)
Consultancy Services for Authority`s Engineer for Supervision of Rehabilitation & UP-gradation to 2 L+PS/4 L to Nhavara to Chaufula section of NH - 548 DG I.e. (Nhavara to Chaufula Section) Ch. 0/000 to Km. 24/037 of state highway in the state of Maharashtra on EPC Mode (Length 24.037 Km).
Consultancy Services for Authority`s Engineer for supervision of (i) Rehabilitation and up-Gradation to Two lane with paved shoulders of Rajewadi to Warndh village section (Km. 75.100 to 88.100) Part of Lonand - Bhor - Mahad - Mhapral - Mandangad - Pachral - Ambadave, NH-965 DD and (ii) Construction of Major High Level Bridges across Panvel - Mahad - Panjim Road Nh-66 (Old 17) at Km. 91/400 God River, 94/400 Kal river & Km. 161/400 Choradi River in Raigad Distrct in the State of Maharashtra on EPC Mode."
Copyright - All Rights Reserved © www.almondzglobalinfra.com | Powered by ITPL