linkedin

Recently Awarded Projects

Filter Projects:

1.

MBIU Survey for Engineering, Procurement and Construction of Rehabilitation and Upgrading to 2-lane/2-lane with Paved Shoulders Configuration and Strengthening of Fatuah-Harnaut-Barh Section from (Km 0.00 to km 69.60) of NH-30A in State of Bihar under Phase-I of (NHIIP).Contract Package No. - NHIIP-BR-30A-8.

MBIU Survey for Engineering, Procurement and Construction of Rehabilitation and Upgrading to 2-lane/2-lane with Paved Shoulders Configuration and Strengthening of Fatuah-Harnaut-Barh Section from (Km 0.00 to km 69.60) of NH-30A in State of Bihar under Phase-I of (NHIIP).Contract Package No. - NHIIP-BR-30A-8.

2.

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Rohtak-Panipat road (NH-709) near Rukhi Paani village to Junction with Jind-Panipat road (NH-352A) near Gangana village (Km 34+000 to Km 60+800) on Hybrid Annuity Mode Under Bharatmala Pariyojna in the State of Haryana.

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Rohtak-Panipat road (NH-709) near Rukhi Paani village to Junction with Jind-Panipat road (NH-352A) near Gangana village (Km 34+000 to Km 60+800) on Hybrid Annuity Mode Under Bharatmala Pariyojna in the State of Haryana.

3.

Purvanchal Expressway PKG-2

Purvanchal Expressway PKG-2

4.

MBIU Survey at Raipur to Bilaspur section

MBIU Survey at Raipur to Bilaspur section

5.

Two Laning with paved shoulder of Sitarganj - Tanakpur section of NH-125 from Km. 0.000 (Km. 254.600 of NH-74) to Km. 52.200 in the State of Uttarakhand under NHDP-IV on EPC Mode.

Two Laning with paved shoulder of Sitarganj - Tanakpur section of NH-125 from Km. 0.000 (Km. 254.600 of NH-74) to Km. 52.200 in the State of Uttarakhand under NHDP-IV on EPC Mode.

6.

Independent Engineer services during Operation & Maintenance Period for Four Laned Srinagar - Banihal section from Km. 220.700 to Km. 286.110 on BOT (Annuity) in Jammu & Kashmir under NHDP - Phase -II including supervision of Balance works.

Independent Engineer services during Operation & Maintenance Period for Four Laned Srinagar - Banihal section from Km. 220.700 to Km. 286.110 on BOT (Annuity) in Jammu & Kashmir under NHDP - Phase -II including supervision of Balance works.

7.

Carrying out Asset mapping in GIS platform for the work "Improvement of Existing water distribution network in all the water distribution syste (WDS) in areas - X and area - XIII of Chennai Metropolitan Water Supply & Sewerage Board (CMWSSB)

Carrying out Asset mapping in GIS platform for the work "Improvement of Existing water distribution network in all the water distribution syste (WDS) in areas - X and area - XIII of Chennai Metropolitan Water Supply & Sewerage Board (CMWSSB)

8.

MBIU survey for Implementation of Bridge inventory and condition Rating System (BICRS) for recording assets and health of structures in the State of Andhra Pradesh. 1. Development of Six Lane Aluriu - Jakkuva section of NH-130-CD road from Km. 365+033 to Km. 396+800 under Raipur - Visakhapatnam Economics Corridor in the state of Andhra Pradesh, India under Bharatmala Pariyojna on Hybrid Annuity Mode - [Package-1 (AP)] & 2. Development of Six Lane Jakkuva - Korlam section of NH-130-CD Road from km 396.800 to km 421.100 under Raipur Visakhapatnam Economic Corridor in the State of Andhra Pradesh on Hybrid Annuity Mode [Package-2(AP)]

MBIU survey for Implementation of Bridge inventory and condition Rating System (BICRS) for recording assets and health of structures in the State of Andhra Pradesh. 1. Development of Six Lane Aluriu - Jakkuva section of NH-130-CD road from Km. 365+033 to Km. 396+800 under Raipur - Visakhapatnam Economics Corridor in the state of Andhra Pradesh, India under Bharatmala Pariyojna on Hybrid Annuity Mode - [Package-1 (AP)] & 2. Development of Six Lane Jakkuva - Korlam section of NH-130-CD Road from km 396.800 to km 421.100 under Raipur Visakhapatnam Economic Corridor in the State of Andhra Pradesh on Hybrid Annuity Mode [Package-2(AP)]

9.

ATCC Traffic Survey and RR survey for Improvement of Nampur - Satana - Kalwan - Vani - Pimpalgaon - Niphad - Sinnar Road SH -27 Km. 98/300 to 154/000 Tal - Satana, Kalwan, Dindori, iphad, Sinnar District - Nashik (Pimpalgaon to Sinnar) HAM 55 A.

ATCC Traffic Survey and RR survey for Improvement of Nampur - Satana - Kalwan - Vani - Pimpalgaon - Niphad - Sinnar Road SH -27 Km. 98/300 to 154/000 Tal - Satana, Kalwan, Dindori, iphad, Sinnar District - Nashik (Pimpalgaon to Sinnar) HAM 55 A.

10.

ATCC Traffic Survey and RR survey for Improvement of Niphad, Khadak Malegaon, Bhoyegaon, Ganur, Chandwad Roar MDR- 64 Km. 0/00 to 35/200 Tal. - Chandwad / Niphad Dist. - Nashik (Taluka Place Niphad to Taluka Place Chandwad |. State of Maharashtra under MRIP on Hybrid Annuity Mode. (HAM-S5-B).

ATCC Traffic Survey and RR survey for Improvement of Niphad, Khadak Malegaon, Bhoyegaon, Ganur, Chandwad Roar MDR- 64 Km. 0/00 to 35/200 Tal. - Chandwad / Niphad Dist. - Nashik (Taluka Place Niphad to Taluka Place Chandwad |. State of Maharashtra under MRIP on Hybrid Annuity Mode. (HAM-S5-B).

11.

Consultancy Services for prepartion of DPR for Balance work of Construction of 4 laning road from 140.700 to 165.080 (Nrimbanglo to Jatinga section) Km. 165.220 to Km. 190.587 (Jatinga Junction to Harangajao) of NH-54 in the state of Assam under Phase II program of NHDP on HAM mode (Total Length 49.230 Km.)

Consultancy Services for prepartion of DPR for Balance work of Construction of 4 laning road from 140.700 to 165.080 (Nrimbanglo to Jatinga section) Km. 165.220 to Km. 190.587 (Jatinga Junction to Harangajao) of NH-54 in the state of Assam under Phase II program of NHDP on HAM mode (Total Length 49.230 Km.)

12.

MBIU Survey on a daily rental basis at Andhra Pradesh (Gowthami bridge near Ravulapalem)

MBIU Survey on a daily rental basis at Andhra Pradesh (Gowthami bridge near Ravulapalem)

13.

White topping on the existing bituminous carriageway & service road from Kme. 381.00 to Km. 502.00 (ii) VUP with service road at Delhi Darbar Panduranwadi Km. 501.250 (20.00 m x 4.50 m) (iv) LVUP with service road at Sativali Km. 454.180 (12.00 m x 4.00m) (v) safety mesures on Surat - Dahisar section of Nh-48 in the State of Maharashtra (2nd Call).

White topping on the existing bituminous carriageway & service road from Kme. 381.00 to Km. 502.00 (ii) VUP with service road at Delhi Darbar Panduranwadi Km. 501.250 (20.00 m x 4.50 m) (iv) LVUP with service road at Sativali Km. 454.180 (12.00 m x 4.00m) (v) safety mesures on Surat - Dahisar section of Nh-48 in the State of Maharashtra (2nd Call).

14.

Conducting DGPS and UAV Survey and providing Basemap for Paramakudi and Devakottai Tamilnadu

Conducting DGPS and UAV Survey and providing Basemap for Paramakudi and Devakottai Tamilnadu.

15.

MBIU Survey without report writing at Salsala Bari in the State of West Bengal

MBIU Survey without report writing at Salsala Bari in the State of West Bengal.

16.

MBIU (Mobile Bridge inspection Unit) Survey for the Project Titled ‘‘Bharuch Gujarat of NH-64‘‘

MBIU (Mobile Bridge inspection Unit) Survey for the Project Titled ‘‘Bharuch Gujarat of NH-64‘‘.

Copyright - All Rights Reserved © www.almondzglobalinfra.com | Powered by ITPL