linkedin

Recently Awarded Projects

Filter Projects:

1.

Preparation of DPR for upgradation of MDR’s in M.P. Package – III ,Jabalpurin Madhya Pra

Preparation of DPR for upgradation of MDR’s in M.P. Package – III ,Jabalpurin Madhya Pradesh
2.

Technical Consultant for preparation of feasibility report

Technical Consultant for preparation of feasibility report, DPR on EPC mode for up gradation of main road Budhal-Mahore-Gul in 31 BRTF area in J&K State.
3.

Consultancy Services for Authority’s Engineer for Supervision

Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of MerangkongTamlu-Mon Road in Nagaland under SARDP-NE on EPC mode.
4.

Consultancy Services for Authority’s Engineer for Supervision

Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Pfutsero-Phek in state of Nagaland under SARDP-NE on EPC mode.
5.

Consultancy Services for Feasibility

Consultancy Services for Feasibility, Preparation of DPR for up gradation of Tharthri-Kahaljugasar-Kilhotran (J&K) to Makhan-Chachool (H.P) to 2-lane including F.S cum DPR of Tunnel of approx. length 4 km
6.

Consultancy Services for preparation of DPR for selected

Consultancy Services for preparation of DPR for selected stretches of Master Plan Roads of Bhopal
7.

Consultancy Services for preparation of DPR of selected stretches/corridors

Consultancy Services for preparation of DPR of selected stretches/corridors for up gradation to Two/Four lane of Kawardha to Rajnandgaon, Chattisgarh
8.

Consultancy Services for preparation of Feasibility

Consultancy Services for preparation of Feasibility report/DPR of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme/BharatmalaPariyojana Phase - I

(i) Development of Four lane green field road from Machilipatnam South Port to NH-9

(ii) Development of Four Lane green field road from Machilipatnam North Port to NH-SH-46

(iii) Development of 7.2Km green field road connecting NH 65 to Machilipatnam Port

(iv) Upgrading of Manginapudi Beach Road to a 4 lane road, Andhra Pradesh

9.

Supervision & Quality Control Consultancy for works under Pradhan

Supervision & Quality Control Consultancy for works under Pradhan mantra Gram SadakYojnaDistt. Vidisha, Consultancy PIU Package Vidisha-1 in Madhya Pradesh
10.

Supervision & Quality Control Consultancy for works

Supervision & Quality Control Consultancy for works under Pradhan mantri Gram SadakYojnaDistt. Balaghat , Consultancy PIU Package Balaghat-2,Madhya Pradesh
11.

Supervision and Quality Control Consultancy for works under Pradhan Mantri Gram

Supervision and Quality Control Consultancy for works under Pradhan Mantri Gram SadakYojanaDistt. Hoshangabad,Consultany PIU Package Hoshangabad 1 & 2
12.

Supervision and Quality Control Consultancy for works under Pradhan Mantri

Supervision and Quality Control Consultancy for works under Pradhan Mantri Gram SadakYojanaDistt. Rewa PIU Package Rewa 1 & 2
13.

Consultancy Services for Detailed Design & Design

Consultancy Services for Detailed Design & Design support of NH-24 Extension 4 lane bypass from Behta Road toSitapur Road, Uttar Pradesh ,Package2
14.

Consultancy Services for Detailed Design

Consultancy Services for Detailed Design and Investigation for widening and strengthening of TharadDhaneraPanthavada section of NH-68 to Two lane on EPC Mode , Gujarat
15.

Consultancy Services for Detailed Design & Design support

Consultancy Services for Detailed Design & Design support during Construction for Upgradation of Chikhali at Hatni to Dhad section of NH 753 to two laneinMaharashtra,EPC Mode
16.

Consultancy Services for Detailed Design for Widening

Consultancy Services for Detailed Design for Widening of Pipli Bhavnagar section Package 1 to Nari Junction, Gujarat in Hybrid Annuity Mode.
17.

Consultancy services for 5D building information

Consultancy services for 5D building information modeling for Construction of Access controlled Nagpur-Mumbai Super Communication Expressway in Maharashtra on EPC mode for package 5.
18.

Consultancy Services for Detailed Engineering Design

Consultancy Services for Detailed Engineering Design and design support for Construction of Access controlled Nagpur-Mumbai Super Communication Expressway in Maharashtra on EPC mode
19.

Consultancy Services for construction of two laning road-Dist.Bhandara in Maharashtra under MRIP on

Consultancy Services for construction of two laning road-Dist.Bhandara in Maharashtra under MRIP on Hybrid Annuity Mode
20.

Safety Consultancy Services for Rehabilitation and upgradation to Four lanning of Bharagora to Singh

Safety Consultancy Services for Rehabilitation and upgradation to Four lanning of Bharagora to Singhara section, Odisha under NHDP Phase IV on EPC mode.
21.

Appointment as Safety Consultant for VersovaBandra Sea link (VBSL), Mumbai

Appointment as Safety Consultant for VersovaBandra Sea link (VBSL), Mumbai
22.

Financial Consultancy for Construction of 4 lane Brownfield highway section of Jagtial – Karim

Financial Consultancy for Construction of 4 lane Brownfield highway section of Jagtial – Karimnagar – Warangal highway of length 59.320 km from Manakondur village to end of Hasanparti bypass under inter corridor route (ICR) under Bharatmala Pariyojna in state of Telangana - NHAI.

23.

Financial Consultancy for Balance 4 laning work of package 4 from km 315.00 (near nandura) to km 360

Financial Consultancy for Balance 4 laning work of package 4 from km 315.00 (near nandura) to km 360.00 (near chikhli) section of Amravati Chikhli in the state of Maharashtra to be executed on Hybrid Annuity Project under Bharatmala Pariyojna – NHAI.

24.

Safety Consultancy Services for “Formation of new six lane road from Punnapakkam (Design Chain

Safety Consultancy Services for “Formation of new six lane road from Punnapakkam (Design Chainage: Ch 35+000) to Thiruvallur Bypass (Design Chainage: Ch 47+800) with paved shoulders and two-lane service road on both sides in section 2 of Chennai Peripheral Ring Road under EPC mode.

25.

“Safety Audit Services for Four laning of Haridwar-Nagina section of EUP mitigation measures o

“Safety Audit Services for Four laning of Haridwar-Nagina section of EUP mitigation measures on NH-74 in the state of Uttarkhand NHDP Phase-IV on EPC mode (from design chainage LME from 13+829 to 17+110 & 26+007 to 27+508 and design chainage RME from 13+839 to 17+120 & 26+078 to 27+509)”.

26.

Road Safety Audit for Construction of 8 lane Expressway starting at Ch. 47.000 near Khanpur Ghati an

Road Safety Audit for Construction of 8 lane Expressway starting at Ch. 47.000 near Khanpur Ghati and ends at Haryana-Rajasthan border(Km 47.000 to Km 78.800) section of Delhi-Vadodara Greenfiled Alignment (NH-148N)under Bharatmala Pariyojana in the state of Haryana

27.

"Engagement of Safety Consultant Services during Operation and Maintenance of (i) Six laning &a

"Engagement of Safety Consultant Services during Operation and Maintenance of (i) Six laning & Strengthening of NH-248A From Existing Km 2+740 (Rajiv Chowk) to Km 11+682 in Gurugram on HAM in the state of Haryana (Package-I) (ii) Six laning & Strengthening of NH-248A from existing km. 11.682 to km. 24.536 (Design Ch. Km. 9.282 to km. 22.136) in the state of Haryana on HAM (Package-II) (iii) Delhi-Gurgaon section of NH-48 and other works along the project highway from km 11.060 to km 42.00 (Dhaula Kuan in Delhi to Kherki Dhaula Fee Plaza in Haryana)"

28.

Appointment of Safety Consultant for the Project for conducting Audit prior to COD as per NHAI for C

Appointment of Safety Consultant for the Project for conducting Audit prior to COD as per NHAI for Constrcution of Eight lane Expressway starting before KMP Expressway and ends at ch. 47+000 near Khanpur Ghati (Km 18+500 to Km 47+000) section of Delhi -Vadodara Green Field Alignment (NH-148N) on EPC mode under Bharatmala Pariyojana in the state of Haryana.

29.

Appointment of Safety Consultant for Delhi -Amritsar - Katra Expressway (Phase -I Pkg-V) from Km 120

Appointment of Safety Consultant for Delhi -Amritsar - Katra Expressway (Phase -I Pkg-V) from Km 120+250 to Km 157+920 (Total Length 37.67 Km) in the state of Haryana

30.

Appoiintment of Safety Consultant for 4 laning of Dhillon Nagar (Moga) to Bajakhana (Lambwali) secti

Appoiintment of Safety Consultant for 4 laning of Dhillon Nagar (Moga) to Bajakhana (Lambwali) section of NH-105B, (Greenfield Alignment) from design Chainage Km. 0.000 to Km 43.319 under Bharatmala Priyojana in the State of Punjab on Hybrid Annuity Mode

31.

Independent Engineer Services For Rehabilitation And Upgradation To Four Lane Configuration & St

Independent Engineer Services For Rehabilitation And Upgradation To Four Lane Configuration & Strengthening Of Sihuni To Rajol From Km 51.000 To Km 72.000 Of Nh-20 (New Nh-154) (Design Length 18.450 Km) Of Pathankot-Mandi Section Under Nh (O) In Hp On Ham Basis (Package-Iia)

32.

"Authority’s Engineer for Supervision of Construction of Emergency Landing facility on Na

"Authority’s Engineer for Supervision of Construction of Emergency Landing facility on National Highways – Development of emergency landing facility on Balasore- Kharagpur section from Km 83.400 to Km 88.400(total 5 Km) of NH-60(New NH-16) in the State of West Bengal on EPC Mode "

33.

Consultancy Services for preparation of Detailed Project Report (DPR) for decongestion / bypass of N

Consultancy Services for preparation of Detailed Project Report (DPR) for decongestion / bypass of NH-515 in Pasighat town (approx. 10Km) under Road Safety in the State of Arunachal Pradesh

34.

Feasibility study and Detailed. project report for construction to 2 lane with paved shoulder throug

Feasibility study and Detailed. project report for construction to 2 lane with paved shoulder through Green Fiel_d from Vishwanathpur to Kharka Basant (New NH-122A) wfth Land Acquisition of Sitamarhi district in Bihar.

35.

"DPR Tunnel Car Parking at the following locations in the State of Uttarakhand. (i) Nainital-Bh

"DPR Tunnel Car Parking at the following locations in the State of Uttarakhand. (i) Nainital-Bhavali Road (ii) Nainital-Haldwani Road near Rajkiya Vaidhshala "

36.

"Project Management Consultancy Services incuding DPR for Construction of Leh Bypass to 4 Lane

"Project Management Consultancy Services incuding DPR for Construction of Leh Bypass to 4 Lane Specifications Including LA & Utility Shifting on (i) Starting Near Phyang Village near HPCL plant and join Leh-Manali Highway (NH-3) near Upshi (58 kms approx.); and (ii) Bypass road of Leh from NH-01 (Near Rinchen Chowk)- Shanti stupa-Khardung la road Junction-Saboo-NH-3.(24 Km) "

37.

Authority’s Engineer for Supervision of Construction of 6-lane Durg – Raipur – Ara

Authority’s Engineer for Supervision of Construction of 6-lane Durg – Raipur – Arang Bypass section of NH-53 from Design Ch. 44+500 (Vill. Parsada) to Design Ch. 92+230 (Vill. Paragaon) in the state of Chhattisgarh on EPC Mode under Bharatmala (Package - II)

38.

Authority’s Engineer for Supervision of Construction of 6-lane Durg – Raipur – Ara

Authority’s Engineer for Supervision of Construction of 6-lane Durg – Raipur – Arang Bypass section of NH-53 from Design Ch. 0+000 (Vill. Tendesara) to Design Ch. 44+500 (Vill. Parsada) in the state of Chhattisgarh on EPC Mode under Bharatmala (Package - I)

39.

Authority’s Engineer for Supervision Rehabilitation and Upgradation of Jamkhed to Saudata Sect

Authority’s Engineer for Supervision Rehabilitation and Upgradation of Jamkhed to Saudata Section of NH-548D (From Km. 195. to Km. 208.774, Length-13.99 Km) to 2L+PS/4L configration with rigid pavement in the state of Maharashtra on EPC Mode

40.

Authority’s Engineer for Supervision Rehabilitation and Upgradation of Kopargaon to Savali Vih

Authority’s Engineer for Supervision Rehabilitation and Upgradation of Kopargaon to Savali Vihir Section of NH-548D (From Km. 354.00 to 362.663 Km, Length-8.663 Km) of NH -752g to 4l+ps in the state of Maharashtra on EPC Mode

41.

Financial Consultancy for 4-lane with Paved Shoulder from Km 123.650 to 175.080, start of Shahbad By

Financial Consultancy for 4-lane with Paved Shoulder from Km 123.650 to 175.080, start of Shahbad Bypass to End of Hardoi Bypass of NH-731 on HAM basis in the State of Uttar Pradesh (Package-2B)

42.

Engagement of Financial Consultant for Construction and Site for Improvement of existing 4 Lane Nati

Engagement of Financial Consultant for Construction and Site for Improvement of existing 4 Lane National Highway Old NH-22 (New NH-5) on Zirakpur-Parwanoo section from Km 42+350 to Km 43+850 including 2 nos. VUP at Km 43+051 and Km 43+286 in the State of Haryana in EPC Mode.

43.

Financial Consultancy for construction of additional 3 lane with paved shoulder as realignment of ba

Financial Consultancy for construction of additional 3 lane with paved shoulder as realignment of bakaner ghat of NH 52 (design length 8.87km) on EPC Mode in MP

44.

Financial Consultancy for Six Laning of Surat - Nashik - Ahmednagar Greenfield Stretch [Package-IV f

Financial Consultancy for Six Laning of Surat - Nashik - Ahmednagar Greenfield Stretch [Package-IV from km 105.000 to km 146.000] in the State of Maharashtra to be executed on Hybrid Annuity Mode under Bharatmala Pariyojana

45.

Engagement of Financial Consultant for Construction of 4-Laning of Kushner to Amjhar Road from km 74

Engagement of Financial Consultant for Construction of 4-Laning of Kushner to Amjhar Road from km 74.700 to km 93.250 (Jabalpur Ring Road, Pkg-4) under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC Mode

46.

Financial Consultancy for construction of 4 Lane with paved shoulders from Design Ch. 228.500 to De

Financial Consultancy for construction of 4 Lane with paved shoulders from Design Ch. 228.500 to Design Ch. 273.400 in Belgaum - Hungund - Raichur Section of NH -*** (Ext. SH-20) on Hybrid Annuity Mode (Package-6)

47.

Rehabilitation and upgradation of NH-4 from AP/Tamil Nadu Border (Existing Km 133.360/ Design Km 134

Rehabilitation and upgradation of NH-4 from AP/Tamil Nadu Border (Existing Km 133.360/ Design Km 134.890) Nalagampalli (Existing km 171.590/ Design km 172.000) to four lane with paved shoulders (Design Length 37.110) under NHDP - IV in the state of Andra Pradesh on EPC Mode.

48.

Financial Consultancy for "Construction of 4/6 lane Northern Ayodhya Bypass total length of 35.

Financial Consultancy for "Construction of 4/6 lane Northern Ayodhya Bypass total length of 35.40 Kms of Part-1 north of NH-27, from km 0+000 to km 30+400 (Starting near existing km 112+540, ending at km 139+928 of NH-27) and Part-2 south of NH-27 from km 0+000 to km 5+000 on HAM basis under NHDP Phase-VII in the state of Uttar Pradesh

49.

Financial Consultancy for Construction of 6 lane Greenfield Varanasi - Ranchi - Kolkata Highway from

Financial Consultancy for Construction of 6 lane Greenfield Varanasi - Ranchi - Kolkata Highway from Donoreshan Village to Junction with NH-20 inBongabar village from Km. 288.600 to Km. 325.500 under Bharatmala Pariyojana in the state of Jharkhand on Hybrid Annuity Mode (Package 11)

50.

Financial Consultancy for Cnstruction of 4 lane Access Controlled Greenfield Highway Section on NH-

Financial Consultancy for Cnstruction of 4 lane Access Controlled Greenfield Highway Section on NH-163 G (Warangal - Khammam) from Oorugonda village in Hanamkonda District at Design Ch. 112.240 Km. to Venkatpur village in Warangal District at Design Ch. 150.240 Km. (Total Length 38.000 Km) under other Economic Corridor (NH(o)) programme on Hybrid Annuity Mode inthe State of Telengana (Package -I)

51.

Financial Consultancy for Strengthening And Routine Maintenance Of NH-31(new NH 27 ) From Km 447.000

Financial Consultancy for Strengthening And Routine Maintenance Of NH-31(new NH 27 ) From Km 447.000 To 551.000 Dalkhola-Ghoshpukur Section (Excluding Islampur Bypass) In The State Of West Bengal

Copyright - All Rights Reserved © www.almondzglobalinfra.com | Powered by ITPL